Warning: strtotime() [function.strtotime]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'America/New_York' for 'EDT/-4.0/DST' instead in /home/eerl/public_html/lib/ScoutLib/ApplicationFramework.php on line 1126

Warning: Cannot modify header information - headers already sent by (output started at /home/eerl/public_html/lib/ScoutLib/ApplicationFramework.php:1126) in /home/eerl/public_html/lib/ScoutLib/ApplicationFramework.php on line 158
the Environmental and Energy Resources Library - Using DOE 2.1E to Evaluate Green Building Construction Opportunities and Ventilation Design for Lotus School Skip Navigation

the Environmental and Energy Resources Library

Home Browse Resources Get Recommendations Forums About Help Advanced Search

Using DOE 2.1E to Evaluate Green Building Construction Opportunities and Ventilation Design for Lotus School

An eight-page building simulation paper. In the standard design process of a building, total building simulation using building simulation software is encouraged to be incorporated into the design process as early as possible. However, this paper demonstrates that building simulation can be used as late in the process as the early construction phase of a building project, though usually with increasing cost of building modifications. Using building utility budget as an indicator, the options presented through use of building simulation tools can justify the change to the design or construction, by showing a reduction in the expected operational costs over the lifetime of the building. DOE 2.1E available at http://doe2.com/DOE2/index.html.

Cumulative Rating: (not yet rated)
Date Of Record Release 2010-11-14 13:55:39
Description An eight-page building simulation paper. In the standard design process of a building, total building simulation using building simulation software is encouraged to be incorporated into the design process as early as possible. However, this paper demonstrates that building simulation can be used as late in the process as the early construction phase of a building project, though usually with increasing cost of building modifications. Using building utility budget as an indicator, the options presented through use of building simulation tools can justify the change to the design or construction, by showing a reduction in the expected operational costs over the lifetime of the building. DOE 2.1E available at http://doe2.com/DOE2/index.html.
Classification
Resource Type
Format
Subject
Keyword Eighth International IBPSA Conference, Construction, Simulation
Selector Selection Committee
Date Of Record Creation 2010-11-14 13:45:31
Education Level
Date Last Modified 2010-11-15 12:31:42
Creator Chimack M.J. & Walker, C.E
Language English
Date Record Checked: 2010-11-14 00:00:00 (W3C-DTF)

Log In:





Mission
EERL's mission is to be the best possible online collection of environmental and energy sustainability resources for community college educators and for their students. The resources are also available for practitioners and the public.

EERL & ATEEC
EERL is a product of a community college-based National Science Foundation Center, the Advanced Technology Environmental and Energy Center (ATEEC), and its partners.

Contact ATEEC 563.441.4087 or by email ateec@eicc.edu