Skip Navigation

the Environmental and Energy Resources Library

Home Browse Resources Get Recommendations Forums About Help Advanced Search

From Water to Wire: Building a Microhydro System

What better place to utilize hydro power than coastal British Columbia? A youth camp installs a substantial system with 500 feet (216 psi) of head, 2,200 feet of pipe, and a 10 inch Pelton runner.

Cumulative Rating: (not yet rated)
Date Of Record Release 2008-11-26 16:02:11
Description What better place to utilize hydro power than coastal British Columbia? A youth camp installs a substantial system with 500 feet (216 psi) of head, 2,200 feet of pipe, and a 10 inch Pelton runner.
Classification
Resource Type
Format
Subject
Source Home Power Magazine
Keyword Renewable energy systems
Selector Offley
Date Of Record Creation 2008-11-26 15:55:25
Education Level
Date Last Modified 2011-01-13 12:30:49
Creator Peter Talbot
Language English
Date Record Checked: 2008-11-26 00:00:00 (W3C-DTF)

Log In: