Changing Codes & Grid Connections

The final connection between a utility-interactive photovoltaic (PV) system and the electrical utility grid is an area of importance to PV system designers and installers. Due to the varying sizes of PV systems and configurations of existing service-entrance equipment, these connections vary significantly among PV systems. Differences in Section 690.64 of the 2005 and 2008 editions of the National Electrical Code (NEC) make these variations even more complex.

Cumulative Rating: (not yet rated)
Date Of Record Release 2008-10-24 17:37:12
Description The final connection between a utility-interactive photovoltaic (PV) system and the electrical utility grid is an area of importance to PV system designers and installers. Due to the varying sizes of PV systems and configurations of existing service-entrance equipment, these connections vary significantly among PV systems. Differences in Section 690.64 of the 2005 and 2008 editions of the National Electrical Code (NEC) make these variations even more complex.
Classification
Resource Type
Format
Subject
Source Home Power Magazine, August/September 2008
Selector Offley
Date Of Record Creation 2008-10-24 17:34:49
Education Level
Date Last Modified 2008-10-24 17:41:56
Creator John Wiles
Language English
Date Record Checked: 2008-10-24 00:00:00 (W3C-DTF)

Log In:





Mission
EERL's mission is to be the best possible online collection of environmental and energy sustainability resources for community college educators and for their students. The resources are also available for practitioners and the public.

EERL & ATEEC
EERL is a product of a community college-based National Science Foundation Center, the Advanced Technology Environmental and Energy Center (ATEEC), and its partners.

Contact ATEEC 563.441.4087 or by email ateec@eicc.edu